Restoration of 500kV Powerline: A Record-Breaking Achievement
On December 10, 2021, a devastating tornado left a 500kV powerline in ruins. Seventeen lattice steel structures crumbled and twisted leaving tens of thousands without power. A quick and responsive engineering partner was required. Allgeier Martin and Associates rose to the challenge. AMA's successful work history led Associated Electric Cooperative Inc. and M&A Power to trust us with this rebuild project. This video tells the story of how AMA planned and designed it.
2023 Summer Interns: Why Did You Choose Allgeier Martin?
Discover why our 2023 summer interns chose Allgeier, Martin and Associates.
Part 2: The Advantages of Long-Tenured Experts at AMA
The U.S. Bureau of Labor Statistics states the average employee tenure at engineering firms is 5.2 years. AMA’s average tenure for engineers stands at 14 years and 12 years for technical staff. But how does this statistic translate to benefits for our clients?
Part 1: The Advantages of Long-Tenured Experts at AMA
The U.S. Bureau of Labor Statistics states the average employee tenure at engineering firms is 5.2 years. AMA’s average tenure for engineers stands at 14 years and 12 years for technical staff. But how does this statistic translate to benefits for our clients?
Evolving Technologies, E-Tech (Part 3)
In Part 3, we discuss three evolving technologies contributing to power generation and their impact on your electric system. Those technologies are 1) Wind Turbines, 2) Solar, and 3) Battery Storage.
Evolving Technologies, E-Tech (Part 2)
In Part 2, we discuss three evolving technologies affecting electric power demand. Those technologies are 1) Electric Vehicles (EV’s), 2) Electric Farm Machinery, and 3) Electric Semi-Trucks.
Evolving Technologies, E-Tech (Part 1)
In Part 1, we discuss four evolving technologies affecting the power grid. Those technologies are 1) Distributed Generation, 2) Smart Grids, 3) Microgrids, and 4) Grid-Interactive Efficient Buildings (GEB’s).
We Asked Our Employees . . .
Employees who have been at Allgeier, Martin from a range of 41 to 8 years answered the question, “What would you say is a significant change in the company since you’ve been here?”
Neosho School District Project Spotlight!
The Neosho School District received funding through The Next Step Ballot Measure to pay for several upgrades to the Neosho School District facilities. Thus far, three projects are completed including two school storm shelters and the High School End Zone Facility.
A Company of Strategic Change
Allgeier Martin had a company-wide meeting covering the new mission and vision statements, as well as a three-year strategic plan for the company going forward.
Office Locations
Corporate
7231 East 24th Street
Joplin, MO 64804417.680.7200
Kansas City
1201 N.W. Briarcliff Parkway
2nd Floor
Kansas City, MO 64116816.673.7540
Springfield
600 W. College Street
Suite 104
Springfield, MO 65806417.862.3355
Rolla
112 West 8th Street
Rolla, MO 65401573.341.9487
Tulsa
321 S. Boston Ave.
Suite 300
Tulsa, OK 74103918.986.1731