Electric Substation Michael Jones, PE/SE Electric Substation Michael Jones, PE/SE

Time and Money, Always Time and Money

No matter the project or client, time and money drive them both. When it comes to designing and constructing infrastructure, how long it takes and what it costs to get it done are two primary concerns for an owner. Therefore, designers and builders who can save an owner time and money rise to the top of the list for consideration.

Read More
Electric Substation Michael Jones, PE/SE Electric Substation Michael Jones, PE/SE

DRY “Don’t Repeat Yourself”

Utilizing Autodesk Inventor for modeling steel structures benefits our electric utility clients in several ways. We can minimize the time spent reworking or repeating structural designs. By applying Inventor’s modeling geometry for the design and detailing, we save time and minimize potential errors or design flaws. These aspects benefit our clients by reducing billable time and minimizing potential errors.

Read More

Office Locations

Corporate

  • 7231 East 24th Street
    Joplin, MO 64804

  • 417.680.7200

Kansas City

  • 1201 N.W. Briarcliff Parkway
    2nd Floor
    Kansas City, MO 64116

  • 816.673.7540

 Springfield

  • 600 W. College Street
    Suite 104
    Springfield, MO 65806

  • 417.862.3355

Rolla

  • 112 West 8th Street
    Rolla, MO 65401

  • 573.341.9487

Tulsa

  • 321 S. Boston Ave.
    Suite 300
    Tulsa, OK 74103

  • 918.986.1731