Michael Judd, PE Michael Judd, PE

The Value of Construction Work Plans

For an electric distribution cooperative to borrow money for system improvements, a Construction Work Plan (CWP) is required. The CWP is a four-year planning document establishing the improvement needs for the electric utility. The CWP is used to obtain a loan from Rural Utilities Services (RUS) or other sources to construct the required facilities. RUS, as the typical lender, establishes the required content for the CWP.

Read More

Office Locations

Corporate

  • 7231 East 24th Street
    Joplin, MO 64804

  • 417.680.7200

Kansas City

  • 1201 N.W. Briarcliff Parkway
    2nd Floor
    Kansas City, MO 64116

  • 816.673.7540

 Springfield

  • 600 W. College Street
    Suite 104
    Springfield, MO 65806

  • 417.862.3355

Rolla

  • 112 West 8th Street
    Rolla, MO 65401

  • 573.341.9487

Tulsa

  • 321 S. Boston Ave.
    Suite 300
    Tulsa, OK 74103

  • 918.986.1731